Restoration revealed
![](https://inside.salk.edu/wp-content/uploads/2017/08/Restoration-reveal_InsideSalk-Summer-2017-2.jpg)
After a year of cloaked construction, the scaffolding came down and Salk’s newly restored teak window wall assemblies were unveiled June 27 during a special outdoor ceremony. The Institute partnered with the Getty Conservation Institute to develop a preservation strategy that included historical research, on-site condition surveys, analysis of the teak and the repairs.